Setting out up the roof gauge set the first batten at eaves to allow the tails of the eaves course tiles to overhang the fascia by 40 to 45mm ie.
Setting out slate roof tiles.
Plus slate is an extremely durable flooring material that requires very little maintenance and does a nice job of disguising dirt.
Start by establishing the position for the lowest batten for the slates tiles on the roof allow for the overhang of.
Choose from single color slate or from multi colored tiles with warm reds and golds over a darker background.
Then determine the position of the highest batten at the top typically the top of the uppermost row of slates tiles.
As you roll out the underlay keep the bottom edge of the material aligned with the edge of the eave but above any metal or synthetic edging that may cover the borders of the eave.
Locate the centre point of the eaves and centre the first under eaves slate.
Alternatively you could use a 12 inch high starter slate thereby guaranteeing a 3 5 inch headlap on the starter course and an 8 5 inch exposure on all field slates.
Another name for the margin is the exposure.
How to slate a roof http www fixmyroof co uk videos and guides pitched roof slate a roof this video shows you the basics of how to set out a roof for slat.
Building paper or self adhering bituminous membrane copper attachers and copper flashing.
Set the last batten at the ridge so that the ridge tiles will overlap the top course of tiles by at least 75mm.
Margin this is the visible or exposed area of a slate from the bottom or tail of one slate up to the point the slate above overlaps it.
Measure between the top of the top batten and the top of.
Position the first roll of underlayment at one side of the roof perpendicular to the lower edge the eave of the roof.
Slate and tile are so durable that they often outlast the underlayment and fasteners.
There is normally enough wiggle room here to close or open the gap from 3mm to space out slates in their horizontal axis when first laying out a slate roof for adjustment purposes.
Just short of the centre of the gutter.
Cut the second under eaves course from the same slate as the first course.
The exposure on the first course of slate must instead be dropped to 7 inches in order to create the 3 inch headlap on the starter course.
Just sweep or vacuum a slate floor regularly.